Upper Level
The upper level was built first. Originally the storage yards (to the left of the plan below) were to be hidden behind low relief factories but my friends insisted that I show off all my rolling stock so I daylighted them. The trackwork is all laid but as I have decided to go down to the lower layer so some areas need modifying to put in the junction.
Join Layer between two levels
Lower Level