I’ve been putting in the missing baseboards on the lower level, laying cork track bed and even laying some track! It’s getting to be a pain because every time I try to do something I discover I am missing a vital piece (shinohara track to join my double crossover to my normal Peco track, a scratch built curved crossing, magnets for the port area, tortoise motors (17 needed!), ash and inspection pits, foam risers, cork and a whole host of things you don’t realise until you don’t have them… I’ve even run out of joiners!)
Thankfully I have great friends so Brian is building the curved crossing and Leigh is coming up with the track, magnets and even hopefully a few tortoise.